The house is almost ready for us to move into. Unfortunately, we have a blue norther coming in on Thanksgiving day, so we can't move in until the woodstove is installed. We sealed the floors with 2 coats of polyurethane. They shine like glass, a really wonderful look. Still unable to transfer photos to my computer.
After the woodstove, we will concentrate on the exterior - finally. Porch railing, steps, porch ceiling fans, and siding.
Tuesday, November 23, 2010
Friday, November 5, 2010
My camera stopped working
I have gobs of pictures, but my camera refuses to transfer them to my computer. I will keep working on it.
The house is very near completion. It has been sheetrocked, taped and bedded, and painted on the interior. It looks outstanding! I'm very pleased with the work we've done. We installed the kitchen counter top yesterday, and will be doing the bathroom counter top today, along with painting the window sills and baseboards. After that, we will be installing the wood stove and sealing the floors. I'm keeping the original floors, as they are solid mohogany. But they have been treated with insecticides (as are all shipping containers), so they need to be sealed. I don't want to be walking around on insecticides, and I sure don't want my pets walking around on them.
We still have exterior work to do. The porch railing, steps, and siding. Stay tuned!
The house is very near completion. It has been sheetrocked, taped and bedded, and painted on the interior. It looks outstanding! I'm very pleased with the work we've done. We installed the kitchen counter top yesterday, and will be doing the bathroom counter top today, along with painting the window sills and baseboards. After that, we will be installing the wood stove and sealing the floors. I'm keeping the original floors, as they are solid mohogany. But they have been treated with insecticides (as are all shipping containers), so they need to be sealed. I don't want to be walking around on insecticides, and I sure don't want my pets walking around on them.
We still have exterior work to do. The porch railing, steps, and siding. Stay tuned!
Saturday, May 8, 2010
The porch is on.
Saturday, September 26, 2009
Finally - a finished roof!


After numerous delays due to monsoon type weather, the roof is finally completed. Still haven't finished the plumbing. There are only 3 major tasks to be completed now - sheetrock, siding, and the porch flooring. The house is livable now without sheetrock, so I've decided to do the porch next. The porch will be so grand, that's where I'll be "living" most of the time anyway.
I don't know if you can appreciate the roof in the photos - hopefully so - but believe me, it's a thing of beauty after weeks of working on it.
Saturday, August 29, 2009
We have insulation
This was a really tough decision. Everybody talked about spray foam insulation and how great it is, but we went with batt insulation. We turned on the A/C, and within 20 minutes the temp inside the house had dropped from 95 to 85.
Monday, August 10, 2009
Well, there hasn't been a lot going on lately. The felt is on the roof. Otherwise, I've been busy talking to insulation contractors and getting bids. Work continues on the inside, some framing here and there, little touchup framing. I hope to get started on the plumbing this week and will post some photos next week. In the meantime, I've got to make a decision on the insulation!